The Constructing Excellence Innovation in Practice project ‘Öppen’ case study is now available to download

The Constructing Excellence Innovation in Practice project ‘Öppen’ case study is now available to download

The Royal United Hospitals Bath, NHS Foundation Trust required a new building for their Medical Records and Information Management Technology Departments. Their brief was for a building that was easily adaptable and also needed to be economical and durable: precisely the solution that Öppen offers. The Öppen system was invented by SRA Architects, and it is a fusion of mass-customisation, Open Architecture, pre-fabrication and on-site assembly, lean construction, and open source materials.  SRA Architects worked with Pollard as the main contractor to deliver this project using Öppen, and as a result of this approach, the project achieved a 15% reduction on cost and 31% reduction on delivery time against a traditionally designed building.

The case study giving full details about the project is available to download CE Oppen final case study

About Author

Write a Comment

Your e-mail address will not be published.
Required fields are marked*